Oasis Palms

The Lost Pearl of the Mojave Desert

  • Home
  • Movie
    • Open Call
    • Screenplay
    • Audiobook
      • 01 A Ship in the Desert Part 1
      • 01 The Desert’s Price Part 2
      • 02 Claiming a Kingdom
      • 03 Gilded Sacrifice
      • 04 Railroad to the Future
      • 05 Jackson’s Gamble
      • 06 Medicinal Whisky
      • 07 Lightning in a Bottle
      • 08 Lefty’s Folly
      • 09 Winds of Change
      • 10 Runnin’ With the Devil
      • 11 The Last Tango
      • 12 Six Feet Under, Part 1
      • 12 Six Feet Under, Part 2
      • Voice Cast
    • Resources
      • Characters
      • Visual Bible
      • Storyboards
  • Origins
    • Oasis Palms History
    • Oasis Palms Model Railroad
      • Gallery
      • Video
      • Blog
  • My account
    • Oasis Market
    • Cart
    • Checkout
    • Refund and Returns Policy
  • Contact

Building the Terrain

January 3, 2023 Stephen Leave a Comment

To create the terrain that surrounds Oasis Palms, the same pink foam used for the deck was stacked and carved with hot wire tools and razor knives to approximate the plateau terrain. For space savings, the outer loop was compressed closer to town and it uses an exaggerated 4-degree incline to get the train from the town level to the scenic railroad level which was 30′ feet in the air. The left side of the deck has the caverns that housed the Barco Mining operation.

Volunteers built out Buttes and Mesas that were added to visually anchor the corners of the model. Lightweight spackle that has the consistency of whipped cream was used to fill gaps and add texture to the rock formations. This was then all painted with a base layer of dirt brown and multiple layers of accent paint to approximate the chocolate brown hue of the Ship Mountains of the Mojave Desert.

To achieve the effect of the Mojave hill terrain the paint steps included

  1. Base coat of Dirt Brown,
  2. Black wash using 10% flat Black paint+90% water,
  3. Soft brush application of Dirt Brown on mid & high areas,
  4. Dry brush application of Raw Sienna in the erosion crevises (desert varnish effect),
  5. Dry brush application of 75% Dirt Brown + 25% Titanium White on high areas,
  6. Dry brush application of Titanium White on the edges of rocks.

 

 

Virtual Tour

Previous: Building the Layout Table
Next: Laying the Track

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Copyright © 2026 OasisPalmsCA.com · Log in